Additional information for operators

Operational permit:

For specific aerodromes in Norway there are special requirements for aircraft operators performing commercial transportation.

The aircraft operator shall document fulfilment of the requirements above to CAA Norway at least 14 days prior to commencing operations. CAA Norway will, after evaluating the documentation and finding it adequate, issue a letter of compliance

The process of obtaining a letter of compliance is described in «How to obtain an operational permit for category B and C airports in Norway»


Additional information for operators

Some general considerations addressing challenges one might meet during operations in Norway, and the most relevant factors resulting in an AD’s categorization, are described in «Tilleggsinformasjon for operatører/Additional information for operators».

This information is not required by ICAO Annex 15, and updates do not follow the AIRAC-cycle. The information should be considered advisory.

How to obtain an operational permit for category B and C airports in Norway PDF
Additional information for operators PDF
ENDU - Bardufoss PDF
RWY marking and lights, start TORA/ASDA/TODA on Avinor's aerodromes PDF